A concrete facade rising against the sky

Under construction · Bookings open

Gul Skyline

The third building. Same team. Same standard. Higher.

Stage
To be confirmed
Completion
To be confirmed
Location
Islamabad
Bookings
Open

The project

The most ambitious building we have made, and the least risky

Gul Skyline is a mixed-use tower in Islamabad, and it’s the most ambitious thing G & S Builders has built.

It’s also the least risky, and that’s not a contradiction. Everything we learned delivering Gul Heights 1 and 2 — the structural decisions that held up, the layouts residents actually liked, the finishing that stayed good after years of use — goes into this building. Same engineers. Same site team. Same suppliers.

Work is underway now — the rig is on site and the foundations are going in. The stage the building has reached, the target completion date and the current price list come straight from the sales team, dated the day you ask for them.

Zahid Gul outside the Gul Heights 2 booking office in Islamabad

In-house delivery — land, design, structure, MEP, finishing, handover

At a glance

The specification, as it stands

Rows still to be confirmed are published the day the drawings are signed off. We put nothing here we cannot evidence — a wrong unit count or approval number is worse than none.

Location
Islamabad
Floors
To be confirmed
Total units
To be confirmed
Unit types
To be confirmed
Unit sizes
To be confirmed
Parking
To be confirmed
Status
Under construction — foundations
Completion
To be confirmed
Approval
To be confirmed

The homes

What you are buying into

Plans sent on request

01

A mixed-use building, on purpose

Shops and commercial floors at street level, homes above. It is the model both Gul Heights towers were built on and the one buyers in D-17 already recognise: the ground floor earns its keep, and the address stays busy after six in the evening.

02

The layouts that already worked

Gul Skyline inherits what Gul Heights 2 got right — the plans residents actually liked, the finishing that stayed good after years of use, the structural calls that held. Same engineers, same site team, same suppliers.

03

Plans the day you ask

Covered area, room dimensions and the floor plan for any unit still open are sent the same day. Nothing appears on this page before it is signed off, which is why the schedule reaches you from the sales desk rather than from here.

Ask for the unit schedule and we will send the plans for the floors still open, with the sizes and the current availability against each one — call +92 341 977 0777.

What’s in the building

Eight things every buyer asks about

LiftsNumber and makeTo be confirmed
PowerStandby provisionTo be confirmed
WaterStorage capacityTo be confirmed
SecurityGuarding, CCTV, access controlTo be confirmed
ParkingBays and accessTo be confirmed
CommunityShared and prayer spaceTo be confirmed
RooftopTerrace provisionTo be confirmed
CommercialStreet-level floorsTo be confirmed

Every one of these is drawn and specified before a single unit is sold. Makes, capacities and counts are confirmed to you in writing — buyers hold a builder to an amenity list, and a row we have not signed off is easier to live with than one we got wrong.

The location

Where Gul Skyline stands

Gul Skyline is going up in Islamabad, on the same side of the city G & S Builders has worked in since the first tower. The plot, the approach roads and the drive times are published here the day the address is confirmed in writing — and not a day earlier, because a buyer will go and measure them.

Published on confirmation

  • The plot number and the approach roads
  • Drive times, measured rather than estimated
  • The approved site layout, as drawn

The two finished towers are at Main Markaz D-17, steps from Margalla Avenue. Go and stand outside one before you decide.

Site map Added the day the plot address is confirmed in writing.

Bookings open

Booking and payment

Bookings for Gul Skyline are open. The structure is below. The figures come from the sales team, because they change with the plan you choose and the stage the building is at.

  1. 1

    On booking

    To be confirmed

  2. 2

    Through construction

    To be confirmed

  3. 3

    At handover

    To be confirmed

Contact our sales team for the current price list and availability.

Request the price list Book a site visit WhatsApp us Brochure — sent with the price list

Why buy off-plan from us

We have done this twice, and both times the buyers got their keys

Buying a unit before it exists means trusting the builder. So here’s the relevant fact: we have done this twice, and both times the buyers got their keys.

Gul Heights 1 and Gul Heights 2 were both sold off-plan and both delivered. Every buyer in those buildings took the same leap you’re considering, and every one of them is now living in or renting out a finished apartment.

Before you decide anything about Gul Skyline, go and see them.

2

Towers built

2

Towers delivered

2

Towers lived in

Gul Heights 1 at Main Markaz D-17, Islamabad — the six-floor front elevation with lit signage above the arcade Completed · Fully occupiedGul Heights 16 floors at Main Markaz D-17, occupied since handover.See Gul Heights 1 Gul Heights 2 at Main Markaz D-17, Islamabad — stacked balconies above the street-level arcade Completed · Fully occupiedGul Heights 27 floors at Main Markaz, occupied since handover.See Gul Heights 2
A piling rig boring foundations at last light.

On site

Foundations first

Before a floor plan means anything, a rig has to put piles into the ground. That is what this is — foundation work on a G & S Builders site in Islamabad, filmed as it happened.

No soundtrack, no commentary, nothing staged for a camera.

Construction progress

A dated log, updated every month

Monthly cadence

  1. First entry

    Foundations

    The opening entry covers the piling and foundation work now under way on site — the same work in the clip above. It is published once the month’s pour is signed off, with the site manager’s own account and the photographs taken that week.

    Site photograph
  2. Every month after that

    The log runs from the first month on site through to handover, so a buyer can read the whole build back in order.

How this log works. It is written on site and published once a month. Entries are added after the work is done — no milestone appears here before it happens, and none has been invented to fill the page.